一家专业电动餐桌订制生产的工厂!
4年服务上家酒店,数家会所及别墅!全国300多家经销代理商!!
立即咨询:13925433337【微信同号】

当前位置:主页 > 自动餐桌 >

电动餐桌定制的流程介绍 Introduction to the Process

电动餐桌定制的流程介绍 Introduction to the Process

型号:
139-254-33337 立即咨询
价格:

咨询电动餐桌定制的流程介绍 Introduction to the Process订购热线

电动餐桌定制的流程介绍 Introduction to the Process配置参数

品 牌 形状 风格 颜色
材质 功率 电源 工艺
发货地 供货总量 尺寸 配置
是否订制 发货时间 使用场所 定制方式

电动餐桌定制的流程介绍 Introduction to the Process详细说明

电动餐桌定制的流程介绍
Introduction to the Process of Customizing Electric Dining Tables










电动餐桌定制可以根据户型和业主生活习惯进行设计,很显然这是它的优势之一,也正是如此,电动餐桌定制越来越受到大众的喜爱,在定制电动餐桌之前,业主也需要对电动餐桌定制有一定的了解。 1、签订电动餐桌订购单  在确定电动餐桌定制厂家之后,就可以签订一个订单,并预交一定的订金。注意要妥善保存定金单,待签订合同后返还到电动餐桌合同款内。  
Customization of electric dining tables can be designed according to the layout and the living habits of the homeowners, which is clearly one of its advantages. Therefore, electric dining table customization is becoming increasingly popular among the public. Before customizing electric dining tables, homeowners also need to have a certain understanding of electric dining table customization. 1. After confirming the manufacturer of the customized electric dining table, you can sign an order and pay a certain deposit in advance. Please keep the deposit form properly and return it to the contract payment for the electric dining table after signing the contract.








2、次现场测量  签订订单后,就可以要求电动餐桌设计师上门次测量。初次测量应该在水电改造之前,水电工、工长好都在场,要结合厨房的水电布局,综合考虑,是否需要对水电管道进行改装等。并告知道设计师自己需要的厨房电器与打算放置的位置。此次测量后,设计师根据厨房空间设计出整体电动餐桌的雏形以及厨房的水电改造图纸。水电施工工人根据图纸施工。  3、第二次现场测量  二次测量的时间一般都在水电改造、墙地砖施工完成之后。这次测量,数据一定要精确,厨房电器位置与尺寸也要确定下来。设计师需要根据测量结果,给出电动餐桌定制的终精确设计图  
2. After signing the order for on-site measurement, the electric dining table designer can be requested to conduct on-site measurement. The first measurement should be conducted before the water and electricity renovation, with the presence of both the electrician and the foreman. It should be combined with the layout of the kitchen's water and electricity, and a comprehensive consideration should be given to whether it is necessary to modify the water and electricity pipelines. And inform the designer of the kitchen appliances they need and the intended placement. After this measurement, the designer designed the prototype of the overall electric dining table and the water and electricity renovation drawings of the kitchen based on the kitchen space. Water and electricity construction workers construct according to the drawings. 3. The second on-site measurement usually takes place after the completion of water and electricity renovation and wall and floor tile construction. For this measurement, the data must be accurate, and the position and size of kitchen appliances must also be determined. The designer needs to provide a final and accurate design drawing for the customized electric dining table based on the measurement results










4、核对电动餐桌定制设计图纸  第二次测量过后一般三天内就可以看到电动餐桌定制设计图,收到图纸的时候,除了看效果图以外,更需要仔细看清楚CAD图,上面的标示的尺寸要核对清楚,如果一旦出错,后期设计的电动餐桌肯定不合适,不但安装起来麻烦,而且达不到定制的效果了。  5、签订合同付首款  设计方案确定之后,需要与设计师提前约好时间到店面签订一份详细的供货合同,并预付款。合同里有关于产品总价,支付方式,交付安装,验收,售后等各种规定,另外合同也会附有《核价清单》与《设计图纸》两份文件。合同事关重大,签订的时候需要仔细确认每一个条款。  
4. After checking the customized design drawings of the electric dining table for the second measurement, the customized design drawings of the electric dining table can generally be seen within three days. When receiving the drawings, in addition to looking at the renderings, it is also necessary to carefully review the CAD drawings. The dimensions indicated on the drawings should be checked clearly. If there is an error, the later designed electric dining table will definitely not be suitable, not only will it be difficult to install, but also cannot achieve the customized effect. 5. After the contract is signed and the first payment for the design scheme is confirmed, it is necessary to schedule a detailed supply contract with the designer in advance to the store and make a prepayment. The contract includes various regulations regarding the total price of the product, payment methods, delivery and installation, acceptance, after-sales, etc. In addition, the contract will also be accompanied by two documents: a "Price List" and a "Design Drawing". The contract is of great significance, and each clause needs to be carefully confirmed when signing.










6、送货安装  电动餐桌的送货和安装一般都是免费的,厂家工作人员会在送货之前依据合同约定的时间,提前与客户预约时间送货安装。  7、验收检查  电动餐桌工作人员安装完毕,业主对整套电动餐桌进行全面检查,验收合格付清余款。  电动餐桌定制流程一般就分为以上7个步骤,其中确定电动餐桌定制厂家是非常重要的,其次,是选择电动餐桌材料和电动餐桌的尺寸,这也都是至关重要的,关于电动餐桌定制合同里面的条款需要业主认真仔细的查看,切勿马虎大意,如果后期出现问题,毕竟合同是维护业主权益的一种有效证据。
6. Delivery and installation of electric dining tables are generally free of charge. The manufacturer's staff will schedule a delivery and installation time with the customer in advance according to the agreed time in the contract before delivery. 7. After the installation of the electric dining table by the acceptance inspection personnel, the owner conducted a comprehensive inspection of the entire set of electric dining tables, and the remaining payment was made after passing the acceptance inspection. The process of customizing an electric dining table is generally divided into the above 7 steps, among which determining the manufacturer of the electric dining table customization is very important. Secondly, selecting the materials and dimensions of the electric dining table is also crucial. The terms in the electric dining table customization contract need to be carefully reviewed by the owner, and should not be careless. If problems arise in the later stage, after all, the contract is an effective evidence to protect the owner's rights and interests.
立即拨打:13925433337


买电动餐桌定制的流程介绍 Introduction to the Process的联系方式

工厂:佛山市岚慧家具有限公司
联 系 人:邱生;
电 话:13925433337;
微 信:13925433337;
Q Q:305040938;
座 机:0757-63360531;
公司地址: 广东佛山市西樵镇大同七星工业区

点击咨询

电动餐桌买卖客服二维码

上一篇:|定制鞋柜的五个要点及四种鞋柜款式 |Five key p
下一篇:|全屋电动餐桌定制应该如何搭配颜色 |How to mat


更多新款电动餐桌定制的流程介绍 Introduction to the Process流行排行榜


更多热销电动餐桌定制的流程介绍 Introduction to the Process新款推介


文章来源:
未知
欢迎转载,本文标题:电动餐桌定制的流程介绍 Introduction to the Process
转载请注明原文网址:http://www.7s2s.com/zidong/2024/0926/12929.html